The project involves the construction of a new steel building and a concrete fire protection water tank at an industrial facility in Aliveri, Evia. In addition to the construction of the foundation and the steel framework, the project included the construction of perimeter walls with polyurethane panels, as well as the installation of industrial roller shutters and doors.
The total project budget was €550,000€ and the works were carried out between September and December 2023.