Works for the development of interior and exterior spaces at an industrial facility in Evia. The works include the construction of epoxy flooring over an area of approximately 2,500 m², the construction of a steel canopy, the repair of corrosion damage to columns, various interior construction works (drywall installations, insulation, tile and laminate flooring installations, door replacements, painting, etc.), and exterior landscaping (curb installation, parking area line painting, manhole repairs, grass grid installation, automatic irrigation, etc.).
The works have been carried out gradually since February 2022, and the total budget to date is 163.000€.