The project involves the assessment and strengthening of the 4 buildings of an industrial facility in Oinofyta with a total area of approximately 13,000m². The installation consisted of 4 statically independent buildings that were constructed at different periods, with different load-bearing systems (either RC columns and beams with steel roofs, or steel buildings above RC basements). The reinforced concrete members were strengthened with shotcrete jackets and with FRP laminates and sheets, while in older buildings the steel roofs was completely replaced.
The strengthening was carried out just in 40 days in the summer of 2020. The seismic design of the interventions on the reinforced concrete members was carried out with the SeismoBuild software, employing Eurocode 8. Part-3.