The project includes the maintenance and retrofit works on a logistics warehouse of total area more than 35,000 m² in Thiva. The works included the inspection of the steel frame of the building, checks of the connections, replacement of some steel members, addition of new members plates or anchor, the application of corrosion protection, the restoration of the fire-resistant paint and repairs to the fire protection system.
The works were carried out in February 2024 without interrupting the operation of the warehouse.