The project involves the strengthening of the reinforced concrete members of the buildings of an industrial facility in Oinofyta with a total area of approximately 13,000m². The reinforced concrete members were strengthened with shotcrete jackets (more than 100 columns of more than 10m height each) and with FRP laminates and fabrics.
The works were carried out between November 2020 and March 2021.