The project includes the design and construction of the strengthening interventions of the a three-storey building in Chalkida, so as to add two storey in heights. The strengthening interventions involve the re-design and construction of new the building foundation, the construction of new shear-walls, the strengthening of existing reinforced concrete elements with jacketing using cast in-situ concrete or shotcrete, the enhancement of the columns’ confinement with carbon fibre fabrics etc.

The construction began in May 2008 and was completed in two months.