The project involves the strengthening of a Ζoellner slab in a reinforced concrete building in the Petralona region in Athens, which has been severely damaged due to fire. The strengthening was done with jacketing, employing shotcrete in the lower side of the slab and cast concrete in the upper side.

The project was carried out in October 2013.